FAST QUOTES · FAST SHIPPING · LESS DOWNTIMEFor owner-operators, contractors & fleets

Dozer Assembled Track Groups

An assembled track group combines the chain and shoes in one replacement assembly. Define the chain design, shoe width, link count, and connection style before comparing quotes. Get a fast quote and review shipping options for the parts that will put your dozer back to work.

Request A Quote

Aftermarket Assembled Track Groups

An assembled track group combines a track chain with its shoes and fastening hardware. It reduces the shoe-transfer work required with a loose chain, but it still needs the correct link count, shoe specification, and master connection. A group for one side, a pair, and a complete undercarriage package are different order scopes.

Supporting Components

  • The link assembly includes chain links, pins, bushings, and the joint’s specified seals or lubricant.
  • Track shoes provide the selected width and grouser design.
  • Shoe bolts and nuts secure the plates to the chain.
  • The matching master link or master pin closes the group; supplied connection parts need confirmation.
  • Sprockets, rollers, idlers, and other undercarriage pieces are related components but are not automatically part of a track-group order.

Types Of Assembled Track Group Parts Available

Available options depend on the machine and installed assembly. Confirm the exact design and supply scope in the proposal.

Single Groups And Matched Pairs

A supplier may quote one assembled group or a pair for both sides. Confirm the unit of sale and whether each group has the same specification. Record any side-specific connection or shipment details instead of assuming a two-track repair is included.

Dry Or Lubricated Track Groups

The assembled group inherits its chain’s joint construction. Ask for the exact dry, sealed, lubricated, or system-specific specification. Compare the expected application and mating components, as well as the convenience of shoes arriving installed.

Shoe And Shipping Configurations

Groups can be specified with different approved shoe widths and designs. Shipping arrangements may involve an open master connection or other preparation. Ask how the group arrives and which on-site connection work remains, without treating a transport arrangement as a fitment specification.

Sample OEM Product Numbers

Use these example part numbers to describe your request. Confirm the full machine serial number, current assembly, quantities, and current replacement references with the supplier before ordering.

Check whether each number identifies a complete assembly or an individual supporting component. Confirm all included pieces when requesting a package or kit.

Sample OEM References For Assembled Track Groups
ManufacturerOEM NumberPart Description
Caterpillar522-0077Assembled track group, 44 sections, single grouser, 610 mm shoes, 260.4 mm pitch. Chain-and-shoe assembly for example D10T and D10T2 applications.
Caterpillar416-7045Assembled track group, 40 sections, single grouser, 600 mm shoes, 190 mm pitch. Chain-and-shoe assembly for example D6N applications.
John DeereAT305202Track Assembly With Shoes. Original assembly includes shoes. Replacement reference AT305200 identifies a chain without shoes; confirm the complete supply scope.
John DeereAT305309Track Assembly With Shoes. Original assembly includes shoes. Replacement reference AT305200 identifies a chain without shoes; confirm the complete supply scope.
Komatsu14X-32-02690Assembled track chain and shoes. Chain-and-shoe assembly example for D65EX-16/-17 arrangements; 510 mm single-grouser shoes.
Komatsu14X-32-02710Track shoe assembly. Chain-and-shoe assembly example for D65EX-16/-17 arrangements; 610 mm single-grouser shoes.
Dressta / Dresser785150125Track chain with 22 inch shoes. TD-25M EXTRA chain-and-shoe group with 22-inch shoes.
Dressta / Dresser785150126Track chain with 24 inch shoes. TD-25M EXTRA chain-and-shoe group with 24-inch shoes.
CASE418497A1Sealed-chain link service kit — component example. 850L chain service scope; includes chain reference 407015A1 and supporting joint components. Individual component for a chain-and-shoe scope; not a complete assembled track group.
CASE328942A118-inch track shoe — component example. Shoe component for an 850L extended-life track assembly. Individual component for a chain-and-shoe scope; not a complete assembled track group.

How To Choose The Right Assembled Track Group

Send the installed chain number, links per side, pitch, shoe width, grouser style, master design, and machine identification. Ask the written proposal to state the chain and shoe numbers separately and list the connection pieces.

Compare a group with loose chains plus inspected reusable shoes, transfer labor, and specified hardware. Check the rollers, idlers, and drive teeth that will contact the new group before choosing a track-only scope.

How To Order The Assembled Track Group Parts You Need

Start a parts request for your dozer with the full manufacturer, model designation, serial number or PIN, and the installed component numbers. Describe the assembled track group repair, the quantity, the side or mounting position, and any parts the workshop will reuse. Add clear photographs and previous replacement records where available. Explain missing identification so the supplier can request the correct additional information.

Review the written proposal before placing an order. Confirm the part specification and any superseded number, included supporting pieces, mounting hardware, price, availability, freight, and delivery timing. Ask about warranty and return terms for the actual product. Check the ship-to address, access, and unloading needs. A quote request on this site begins the inquiry; purchase and payment arrangements are confirmed with the supplier.

Keep the confirmed numbers, quantities, and correspondence with the machine’s service records. Inspect the delivered pieces against the proposal before installation, and resolve any differences with the supplier before parts are fitted.

Parts Checks That Help Prevent Repeat Downtime

Keep pitch, link count, shoe width, grouser style, and connection on the same request. Confirm shoes and hardware are included and how the group arrives for transport and installation.

Keep readable component references and the technician’s findings with the quote request. This separates identification, wear condition, and supply scope so each can be checked. Resolve missing information before ordering and inspect the delivered parts against the agreed list before installation.

Comparing Assembled Track Groups Pricing And Delivery

Request pricing for the identified assembled track groups and the exact quantity needed for your dozer. Include the delivery ZIP code, address type, and repair window. Ask the proposal to show the supplied assemblies, related pieces, and mounting hardware. Have the workshop identify installation tasks and any additional repair work so the parts order follows a clear work plan.

Compare freight, availability, lead time, confirmed supplied contents, and return conditions using the same component specification. For large assemblies, ask about packed weights, dimensions, and unloading requirements. Resolve any missing identification before ordering, then keep the confirmed parts numbers with the machine’s service records. Those records help the next component request describe the installed system accurately.

Assembled Track Group Replacement: Expert Planning And Workshop Tips

A smooth replacement starts before dismantling. Obtain the service information for the complete machine and installed assembly, agree on the repair scope, and arrange the tools, handling equipment, qualified labor, and parts needed for your dozer. There is no universal torque value, clearance, or track-tension setting for every model. Use the applicable procedure and component instructions.

  1. Confirm the group weight, packed dimensions, and required lifting arrangement before delivery. Reserve adequate space and handling equipment so the crew can move the supplied assembly under an approved plan.

  2. Inspect the received link count, shoe pattern, and master components before starting the installation. Keep the connection instructions for the exact chain with the work order.

  3. Have mating sprockets and support components assessed before fitting the groups. Complete the prescribed alignment and tension checks afterward, and retain the separate chain, shoe, and connection numbers in the service record.

Before Returning To Work

Before returning the dozer to work, have the technician complete the prescribed inspections and record the installed part numbers. Keep a baseline of the relevant wear or adjustment measurements. Recheck the assembly at the interval required by the service information, and address unusual noise, movement, leakage, or uneven wear promptly.

Fast Quotes. Fast Shipping. Less Downtime.

Send your machine, parts list, delivery ZIP code, and needed-by date. Confirm availability and shipping options for your repair.

Get A Fast Parts Quote